ASTM A333 / A333M - 16 Standard Specification for Seamless and Welded Steel Pipe for Low-Temperature Service and Other Applications. ASTM A333 alloy pipe shall be made by the seamless or welding process with the addition of no filler metal in the welding operation. All seamless and welded pipes shall be treated to control their microstructure.
The main purpose of alloy steel pipe is to use in power plants, nuclear power, high-pressure boilers, high-temperature superheaters and reheaters and other high-pressure and high-temperature pipelines and equipment. It is made of high-quality carbon steel, alloy structural steel and stainless heat-resistant steel. , After hot rolling (extrusion, expansion) or cold rolling (drawing). Alloy steel pipe is a kind of seamless steel pipe, its performance is much higher than the general seamless steel pipe, because this steel pipe inside containing Cr, high temperature resistance, low temperature, corrosion-resistant performance of other non-pipe joints not match, so the more extensive use of alloy tube in the petroleum, aerospace, chemical, electric power, boiler, military, and other industries.
A333 pipe is furnished to nine different grades designated by numbers 1, 3, 4, 6, 7, 8, 9, 10, & 11.
Low Temperature Steel Pipe Specifications & Grades
SA333 & A333 – Grades 1, 3, 6 & 8
A671 CC65 CL22 EFW at -50°F (Welded Alternative to A333)
Flanges: A/SA 350 LF2, LF3
Fittings: A/SA-420 WPL6, WPL3
Product Name | ASTM A333 Alloy Tubes |
Standard | ASTM A333 |
Grades | 1, 3, 4, 6, 7, 8, 9, 10, & 11. |
Production Process | Hot Rolled,Cold Rolled ,Cold Drawn |
Tolerance | OD :+/-1% ,WT:+/-1% ,Length:+/-5cm |
Length | 3-12m or as per customers' requirements |
Surface | According to customer Requirement |
Payment Terms | EXW, FOB, CIF, CFR etc. |
Trade Terms | TT, LC,OA,DP etc. |
Delivery Time | Within 14 days after Receiving 30% TT Advanced or LC at Sight Original |
Application | Alloy steel pipes are mainly used for high-pressure and high-temperature pipelines and equipment such as power plants, nuclear power, high-pressure boilers, high-temperature superheaters and reheaters. They are made of high-quality carbon steel, alloy structural steel and stainless heat-resistant steel. , by hot rolling (extrusion, expansion) or cold rolling (drawing). |
Grade | Chemical Composition (%) | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
C | Si | Mn | P | S | Cr | Ni | Cu | Mo | V | Al | |
Grade 1 | ≤0.30 | 0.40-1.06 | ≤0.025 | ≤0.025 | |||||||
Grade 3 | ≤0.19 | 0.18-0.37 | 0.31-0.64 | ≤0.025 | ≤0.025 | 3.18-3.82 | |||||
Grade 4 | ≤0.12 | 0.18-0.37 | 0.50-1.05 | ≤0.025 | ≤0.025 | 0.44-1.01 | 0.47-0.98 | 0.40-0.75 | 0.04-0.30 | ||
Grade 6 | ≤0.30 | ≥0.10 | 0.29-1.06 | ≤0.025 | ≤0.025 | ||||||
Grade 7 | ≤0.19 | 0.13-0.32 | ≤0.90 | ≤0.025 | ≤0.025 | 2.03-2.57 | |||||
Grade 8 | ≤0.13 | 0.13-0.32 | ≤0.90 | ≤0.025 | ≤0.025 | 8.40-9.60 | |||||
Grade 9 | ≤0.20 | 0.40-1.06 | ≤0.025 | ≤0.025 | 1.60-2.24 | 0.75-1.25 | |||||
Grade 10 | ≤0.20 | 0.10-0.35 | 1.15-1.50 | ≤0.03 | ≤0.015 | ≤0.15 | ≤0.25 | ≤0.015 | ≤0.50 | ≤0.12 | ≤0.06 |
Grade 11 | ≤0.10 | ≤0.35 | ≤0.6 | ≤0.025 | ≤0.025 | ≤0.50 | 35.0-37.0 | ≤0.50 |
Standard airworthiness export packaging, or according to the needs of customers.
We offer different modes of transport depending on the customer's destination: rail transport and ship transport.The Shipping Mark shall consist of: Trade mark, Seller's name, Product name, Applicable standards, Specifications, Package No., Contract No., Heat No., Weight of zinc film, Color, Production date, Weighing method, Net weight, Gross Weight, Consignee and Protection symbols, etc.
Q: Who and where are you?
Shandong Huitong Steel Co., Ltd. is a large steel production enterprise. Our main production base is located at Liaocheng city, shandong province, China.
Q:What kind of metal material does your company do?
Our production scope involves seamless steel pipes, galvanized steel products, stainless steel products, steel plate, customized heterosexual steel pipes and other steels.
Q:What are the advantages in price and quality ?
To offer good quality and competitive price is our company principle.
We can offer our customer good and reasonable price.
Q: OEM Service is acceptable?
Yes, OEM severvice is available.
Q: Payment term and Lead time
A: Payment term is depending on target market condition,order amount,shipment schedule.., or 30% T/T in advance ,balance will be paid against BL copy or LC at sight.
B: Delivery time: for most of pipe,plate, coil.. the lead time is at around7- 15days. For larger order plate, it is subject to the steel plant production order, but. Base on our larger purchasing oder from steel mill, we can assure our customer the delivery date is soon.