10mm 35mm 61mm carbon steel seamless pipes is also an indispensable material for various conventional weapons, and the barrels, barrels, etc. are all made by seamless pipes.
Product Name | ASTM A106 Hot Rolled Seamless Fluid Steel Pipe |
Standard | GB/T13793-1992,GB/T14291-2006, GB/T3091-1993,GB/T3092-1993,GB3640-88 BS1387/1985,ASTM A53/A36,EN39/EN10219,API 5L,GB/T9711.1-99 etc |
Material | 10#,20#,45#,Q235,Q345,Q195,Q215,Q345C,Q345A ASTM A53A/A53B/ A178C/A106B API5L ST37,ST37-2,DIN 1629 ST35, ST45,DIN 17175 ST35.8,DIN 17175 19Mn5 16Mn,Q345B,T1,T2,T5,T9,T11,T12,T22,T91,T92,P1,P2,P5,P9,P11,P12,P22,P91,P92,15CrMO,Cr5Mo,10CrMo910,12CrMo,13CrMo44,30CrMo,A333 GR.1,GR.3,GR.6,GR.7 Gr.B,X42,X46,X52,X60,X65,X70,X80,X100 |
Production Process | Hot Rolled,Cold Rolled ,Cold Drawn |
Tolerance | OD :+/-1% |
Length | 3-12m or as per customers' requirements |
Surface | Black Painting or According to customer Requirement |
Ends | Plain ends or Bevelled ends with Plastice covers |
Payment Terms | EXW, FOB, CIF, CFR etc. |
Trade Terms | TT, LC,OA,DP etc. |
Delivery Time | Within 14 days after Receiving 30% TT Advanced or LC at Sight Original |
Application | Mainly used to Manufacture Water wall Pipes, Boiling water Pipes, Superheated Steam Pipes, Superheated Steam Pipes for locomotive Boilers, Large and Small Smoke Pipes and Arch Brick Pipes, etc. General Seamless Steel Pipe used to Transport water, oil, gas and other Fluids. |
Q: Who and where are you?
Shandong Huitong Steel Co., Ltd. is a large steel production enterprise. Our main production base is located at Liaocheng city, shandong province, China.
Q:What kind of metal material does your company do?
Our production scope involves seamless steel pipes, galvanized steel products, stainless steel products, steel plate, customized heterosexual steel pipes and other steels.
Q:What are the advantages in price and quality ?
To offer good quality and competitive price is our company principle.
We can offer our customer good and reasonable price.
Q: OEM Service is acceptable?
Yes, OEM severvice is available.
Q: Payment term and Lead time
A: Payment term is depending on target market condition,order amount,shipment schedule.., or 30% T/T in advance ,balance will be paid against BL copy or LC at sight.
B: Delivery time: for most of pipe,plate, coil.. the lead time is at around7- 15days. For larger order plate, it is subject to the steel plant production order, but. Base on our larger purchasing oder from steel mill, we can assure our customer the delivery date is soon.